Created by potrace 1.10, written by Peter Selinger 2001-2011

Massachusetts Maintenance Obligations: Habitability and the Sanitary Code

Understand Massachusetts landlord maintenance obligations, including the implied warranty of habitability, heating requirements, and the Sanitary Code.

Melvin Prince
3 分钟阅读
已验证 Apr 2026United States flag
马萨诸塞州可居住性默示保证马萨诸塞州房东维修法律马萨诸塞州维修并扣款马萨诸塞州房东进入通知马萨诸塞州租赁房供暖要求

法律免责声明

本内容仅供一般信息和教育目的。它不构成法律建议,不应作为法律建议依赖。法律法规经常变化——请务必核实当前法规并咨询您所在司法管辖区的持证律师,以获取针对您具体情况的建议。Landager 是一个物业管理平台,而非律师事务所。信息最后验证时间: April 2026.

State Sanitary Code
Strict compliance
Repair and Deduct
Yes, up to 2 mos rent in 12 mos
Heat Requirement
68°F (7am-11pm), 64°F (11pm-7am)

Massachusetts imposes a strong implied warranty of habitability on all landlords. This non-waivable duty requires rental properties to meet the State Sanitary Code (105 CMR 410.000) at all times. A landlord cannot avoid these obligations by drafting them away in the lease.

Official Law Citation: 105 CMR 410.000 (State Sanitary Code) and M.G.L. Chapter 111, Section 127L.

The Implied Warranty of Habitability

Under Massachusetts common law (established in Boston Housing Authority v. Hemingway, 1973), every residential tenancy comes with an implied warranty that the landlord will maintain the premises in a habitable condition. This is a powerful tenant protection because:

  • The tenant cannot waive this warranty.
  • If the warranty is breached, it serves as a defense against eviction for non-payment of rent (the tenant can argue they are not obligated to pay full rent for a substandard unit).
  • A breach of the warranty gives the tenant the right to withhold rent, repair and deduct, or seek damages (including a reduction in rent reflecting the decreased value of the unit).

The State Sanitary Code (105 CMR 410.000)

The Sanitary Code sets the specific, measurable minimum standards that define "habitable." Key requirements include:

Heating Requirements

  • Landlords must provide a heating system capable of maintaining a temperature of at least 68°F (20°C) between 7:00 AM and 11:00 PM and at least 64°F (18°C) between 11:01 PM and 6:59 AM in all habitable rooms.
  • The heating season runs from September 15 through June 15 each year.
  • Even outside the formal heating season, the system must work.
  • (Note: If the tenant has agreed in the lease to pay for heat, the landlord must still ensure the heating equipment is functioning).

Essential Services

  • Hot and cold water at an adequate temperature and pressure.
  • Electricity in working order.
  • Plumbing free from leaks and obstructions.
  • Working kitchen with a stove and oven (unless specifically agreed otherwise).

Structural Standards

  • Watertight and weatherproof exterior (roof, walls, windows, doors).
  • Structurally sound floors, stairways, and railings.
  • Properly functioning locks on all exterior doors and ground-floor windows.

Pest Control

  • The landlord is primarily responsible for pest infestations (roaches, mice, bedbugs) unless the tenant caused the infestation. Bedbug responsibility is nuanced; the landlord is generally responsible for the first treatment.

The Repair Process

  1. Tenant notifies landlord: The tenant should provide written notice of the repair needed.
  2. Landlord responds: The landlord typically has 14 days (for non-emergency repairs) to address the issue. Emergency repairs (e.g., no heat in winter, flooding) must be addressed immediately.
  3. Board of Health inspection: If the landlord fails to act, the tenant can request an inspection from the local Board of Health, which can issue violation notices and fines.
  4. Repair and deduct: If the landlord fails to perform necessary repairs after written notice, the tenant may, in some circumstances, arrange repairs and deduct the cost from rent (up to two months' rent in any 12-month period, with proper documentation).
喜欢这篇指南?分享给朋友:

📬 获取这些法律的变更通知

当房东与租客法律在以下地区更新时,我们会通过邮件通知您: 绝无垃圾邮件 — 仅发送法律变更通知。

我们正在积极为以下地区制定法律指南: United States。加入候补名单,一旦发布,您将第一时间收到通知!

讨论